WANLIN-303
Standalone photoelectric smoke alarm family
Review standalone, 433 MHz, LoRa or 4G candidates only after the exact hardware and radio version is identified.
Export product-family resource
Plan procurement with Standalone Smoke Alarms for Smart Building Fire Detection: review model paths, specification inputs, evidence checks and questions to...
Direct answer
An export standalone smoke alarm detects smoke and provides a local audible warning without requiring a conventional fire alarm control panel. For commercial buildings, buyers should first define the protected space, required local alarm behaviour, reporting method, power arrangement and destination-market evidence.
This page is written for commercial building, facilities and engineering buyers. It is a product-family selection resource, not a claim that every variant has the same approval, radio module or market access.

Model reference image
The image identifies a WANLIN-307 family reference. Radio, power, label and evidence scope can differ by controlled configuration; confirm the SKU/BOM before using any formal product or compliance statement.
Open the WANLIN-307 product passport · Review the public evidence center
Verified manual data
Evidence scope: WANLIN-307 user manual, Ver 1.0. Documented manual configuration only; radio, platform, power and market variants require separate SKU/BOM confirmation.
| Detection principle | Infrared photoelectric smoke sensing with MCU processing |
|---|---|
| Rated working voltage | DC 3 V |
| Battery capacity | 2400 mAh |
| Standby current | ≤ 6 μA |
| Alarm current | ≤ 100 mA |
| Sound pressure | > 80 dB(A) at 3 m directly in front |
| Operating temperature | −10 °C to +50 °C |
| Relative humidity | ≤ 95% RH at 40 °C ± 2 °C |
| Alarm output | Audible and visual alarm |
| Low-voltage indication | Below 2.7 V; indicator and one chirp about every 40 s |
| Normal indicator | Indicator illuminates about every 40 s |
| Approximate weight | 140 g including battery |
| Manual-listed execution standard | GB 20517-2006 |
| Installation reference | GB 50116-2013; final layout must follow project design requirements |
Important: “GB 20517-2006” is presented here as the execution standard stated by this manual. This wording is not a third-party certificate claim and does not establish destination-market acceptance. The manual also advises against use where relative humidity exceeds 95%, air speed exceeds 5 m/s, or heavy dust, water mist, steam, oil mist or corrosive gas is present.
Site-specific planning lens
For this site's commercial buildings focus, the planning lens is “Smart Building Fire Detection for Commercial Buildings.” Treat the alarm, communication path and destination-market evidence as three separate purchasing decisions.
Where a gateway is used, document the supported device count, coverage assumptions, retry behaviour and response when the upstream network is unavailable.
Existing site context: This resource explains Wanlin Fire smart building fire detection for commercial buildings, key specifications, suitable applications and purchasing considerations for professional buyers. Use that context to define the application; it does not replace model-specific technical or compliance review.
System integrators should also describe gateway placement, network ownership, event recipients, escalation rules and any required API or platform handoff.
If the exact configuration is absent from the available evidence, mark the claim pending review instead of extending a result from another variant.
Last reviewed: 2026-11-02 · Reviewed by Wanlin Fire Equipment for product-family and evidence-boundary consistency.
WANLIN-303
Review standalone, 433 MHz, LoRa or 4G candidates only after the exact hardware and radio version is identified.
WANLIN-307
Candidate configurations may include standalone, 433 MHz, LoRa, 4G or NB-IoT; availability and evidence must be confirmed per SKU/BOM.
WANLIN-309
Use when the project requires a local alarm plus a defined reporting path; verify gateway, network and destination-market requirements.
WANLIN-370
A smoke/heat/carbon-monoxide combination concept is not interchangeable with a smoke-only alarm; confirm the required sensing functions first.
Before purchase: request a model-specific evidence pack and have the destination-market requirements reviewed by a qualified local party.
Answers for buyers
No. A certificate or test report must match the exact model, hardware or radio configuration, legal certificate holder, standard, validity period and destination market.
Yes. Review the exact model, legal manufacturer or certificate holder where applicable, ratings, warnings, destination language and document references before production artwork is released.
Compare gateway dependence, local coverage, carrier availability, operating cost, commissioning, outage behaviour, event latency and the evidence required for the chosen radio hardware.
The project team should document local alarm behaviour, event buffering or retry expectations, supervision, user notification and the party responsible for restoring connectivity.
No. Remote event reporting and local audible warning are separate functions. The project specification should define both and identify who responds to remote events.
Send the destination country, application, quantity, reporting method, preferred power arrangement and required delivery schedule to wanlinfirecontrol@163.com. Recommendations and formal claims remain subject to exact-model evidence review.
Browse product information · Read technical FAQs · Contact Wanlin Fire